Login
Sign in
Recover your password.
A password will be e-mailed to you.
Browsing Tag
thermal energy
There are three viable projects for contracting in September's events
Cesp Inaugurates Brazil’s First Thermosolar Power Plant
Construction of the new technology project started in 2017 in western São Paulo, capacity is 0.5 MW
Greater São Paulo: 460 MW from Urban Waste
According to a study by Abren, the metropolitan region of São Paulo could support 23 WTE plants
MSGás Signs Gas Distribution Contract for TPP William Arjona to 2027
Daily quantity contracted for distribution is 1.35 million m³/d
Alunorte Begins Operating It’s First Electric Boiler
Invests with Hydro in a project that is part of the green energy matrix adoption strategy
Justice Cancels Licensing of Coal Mine in RS
Copelmi did not share information about the existence of indigenous communities in the region
RS Delivers Licenses To Cobra Group for Gas-Fired Thermal Plant
Fepam released a preliminary permit for regasification activity and the installation license for the 1,280-MW facility
Eneva: Embracing Energy Transition, Emphasizing Natural Gas
The company studies diversifying sources, developing a renewable portfolio and promoting low-carbon technologies
Vulcan Fund Buys Gera Maranhão from Equatorial Energia
The deal for the thermoelectric plant is worth US$ 15 M
Capacity Reserve Auction Contracts 17 Thermal Plants
Power injected into the system will be 4.43 GW and availability is 4.63 GW
Azulão: Projected Start-Up in the Second Half of 2022
Eneva contracted power from Azulão and Parnaíba in the reserve capacity auction
Capacity Auction: MME Releases Physical Guarantees
The event is scheduled for December 21, with 106 projects